Saturday 1/21/12 - Started cutting the legs today. Looking good so far. Will make more progress tomorrow.
| First cuts made |
| Notching boards for the cross support |
| Cleaning up the notch |
| Almost done... |
| Checking the fit |
| More notching - this will be part of where the table top attaches to the legs. |
| All cleaned up |
| Matching up leg pieces |
| Gluing leg sets |
| Putting together table top frame |
| 1st leg set done! |
| 2nd leg set ready, clamped frames together to prep for carriage bolts |
| Carriage bolts in on 1st leg. This will make the legs and top removable when it is done. |
![]() |
| Inside of the leg set |
| Carriage bolts in.... clamps out. |
![]() |
| Pre-drilled table top supports |
| Table top supports are in - everything is squared up |
| Frame is done! - Tomorrow will be initial staining and table top! |
| Additional supports and sanding done. |
| Start staining |
| Cutting and arranging the top |
| Top is cut and matched up. Tomorrow will attach the boards and begin planing...sanding...etc. |
![]() |
| Predrilled all holes, glue & screws... back outside now. |
| Top is on. Routed the edges, looking good now! |
| sanding... sanding... and more sanding. |
| Pre-conditioner is drying |
| Top is stained and wiped dry |
| close up of the top |
| Calling it a day, time to take it apart and move it back inside again. This will be the last time - good thing, this table is heavy! Next time I take it outside will be to put it in the truck. |



