Saturday 1/21/12 - Started cutting the legs today. Looking good so far. Will make more progress tomorrow.
First cuts made |
Notching boards for the cross support |
Cleaning up the notch |
Almost done... |
Checking the fit |
More notching - this will be part of where the table top attaches to the legs. |
All cleaned up |
Matching up leg pieces |
Gluing leg sets |
Putting together table top frame |
1st leg set done! |
2nd leg set ready, clamped frames together to prep for carriage bolts |
Carriage bolts in on 1st leg. This will make the legs and top removable when it is done. |
Inside of the leg set |
Carriage bolts in.... clamps out. |
Pre-drilled table top supports |
Table top supports are in - everything is squared up |
Frame is done! - Tomorrow will be initial staining and table top! |
Additional supports and sanding done. |
Start staining |
Cutting and arranging the top |
Top is cut and matched up. Tomorrow will attach the boards and begin planing...sanding...etc. |
Predrilled all holes, glue & screws... back outside now. |
Top is on. Routed the edges, looking good now! |
sanding... sanding... and more sanding. |
Pre-conditioner is drying |
Top is stained and wiped dry |
close up of the top |
Calling it a day, time to take it apart and move it back inside again. This will be the last time - good thing, this table is heavy! Next time I take it outside will be to put it in the truck. |