Monday 3/5/12 - Picked up the materials and start the base cabinet.
Most of the materials... |
Base cabinet sides |
Base cabinet frame assembled |
Hutch panels done... |
Squaring up hutch panels |
Back panels in place... |
Brought in in for the night, the boards on the top are tacked in just to hold it square for now... |
Built the drawer boxes for the base |
Installing and aligning the drawer slides |
Both drawers are inane aligned - aded the faces and knobs just for fit. Will have to take them off again when it's time to stain. |
Added some trim to finish off the top. Will have to cut the arch for the door tops to come in just under this. |
Back at it again the next day. Details and sanding. Worked on the drawer fit. |
Got the doors made. Still need to finish them but at least they're framed and glued. |
Started the staining tonight. Also put in the lock... still need to mount the doors and finish the drawers. |